BOT Bien Cuong Joint Stock Company is investor of Ha Long – Van Don highway project. According to design, the length of Ha Long – Van Don highway is near 60km, connecting 2 points from 18 highway (Dai Yen ward, Ha Long province) and spindle to Van Don airport.
This is big project contributing to change the face of Van Don district in particular, Quang Ninh province in general. This project contributes to connect economic triange Ha Noi – Hai Phong – Quang Ninh, creating a premise for the development of the northern key economic region.
Hung Viet Construction Investment Production JSC is proud of constructing the work of the retaining wall using reinforced Polimer Grid (righ route) for project.
Time of construction: 2 months (from March 2018 to May 2018)
High retaining wall: 6-8 meters
Long retaining wall: 180 meters
Main meterials which Hung Viet Company provides, contructs section retaining wall:
– Reinforces geogrids GX 200/50
– Drainage pipes HDPE
– Drainage sheet
– Geogrids
Some pictures on site:
Any information relating to products and technologies, please contact:
Hung Viet Construction Investment Production JSC
Add: 10th Floor, Ford Thang Long Building, 105 Lang Ha, Dong Da District, Hanoi
HN office: Room 25B2, Block CT4, Van Khe New Urban, Ha Dong District, Hanoi
HCM office: Room 1807, G6 Sunrise Riverside Tower, Nguyen Huu Tho Street, Ho Chi Minh
Tel: 024 6683 8855 Hotline: 0978 217 858
Technical assistance: 0912 726 457
Email: Info@hungvietgroup.vn